article thumbnail

Discretionary Permitting: What Homeowners Need to Know

Santa Cruz Architect

The discretionary permitting process is often used by local governments to ensure that proposed land uses are compatible with existing land uses, and that they do not pose an undue risk to public health, safety, or welfare. as to whether or not the permit should be granted. as to whether or not the permit should be granted.

Permits 77
article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Commercial architectural design is a complex, multi-layered process that requires detailed planning, research, and collaboration. Undertaking your own commercial design project can feel a little daunting. This blog will cover: What Is Commercial Architectural Design? In Cape Town, architects operate the same as anywhere else.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

A4 Spotlight: Act 6061 Legislation

A4 Architects

Rhode Island Housing Zoning Map On February 22, 2022, Rhode Island Governor Dan McKee signed into law Act 6061, also known as the “Zoning Modernization and Housing Act.” The new provisions required each of the local Zoning Ordinances to be revised so that they are in compliance in compliance with the Act by January 1, 2024.

Zoning 52
article thumbnail

Skidmore, Owings & Merrill (SOM) Design Iconic External Diagrid for Shenzhen Rural Commercial Bank Headquarters

Architizer

Shenzhen Rural Commercial Bank Headquarters is the new home for a bank that has grown from a rural credit union into a modern commercial bank. Operable windows in all office spaces and two vertical atria span the height of the tower, allowing the building to “breathe” the fresh coastal air as seasonal weather permits. .

article thumbnail

Metro Reports: Pop Blocks, SW Park Apartments, 9330 SE Harold, and more

Next Portland

A permit is under review for an 11-story affordable housing development at 2059 SW Park Ave. Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. Building B consists of seven 2-story town homes totaling 7,452SF.

Permits 83
article thumbnail

Rostokino by CLK Architects | Shopping centres

Architonic

The operation was divided into different zones with complex coordination in between technical departments and the non-stop activity of the tenants. The facade design includes a corporative identity and consists of a prefabricated system of panels where commercial brands can utilize the space.

Permits 98
article thumbnail

Metro Reports: Trinity Academy, Sandy Pine, 2791 NW Thurman, and more

Next Portland

A six unit development at NW 28th & Thurman designed by Skylab Architecture has been submitted for building permit review. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Metro Reports have moved to Portland Maps Reports. w/22-114112-MT.

Permits 86