Remove Commercial Remove Developer Remove Permits Remove Zoning
article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Commercial architectural design is a complex, multi-layered process that requires detailed planning, research, and collaboration. Undertaking your own commercial design project can feel a little daunting. This blog will cover: What Is Commercial Architectural Design? In Cape Town, architects operate the same as anywhere else.

article thumbnail

A4 Spotlight: Act 6061 Legislation

A4 Architects

Rhode Island Housing Zoning Map On February 22, 2022, Rhode Island Governor Dan McKee signed into law Act 6061, also known as the “Zoning Modernization and Housing Act.” The new provisions required each of the local Zoning Ordinances to be revised so that they are in compliance in compliance with the Act by January 1, 2024.

Zoning 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Metro Reports: Pop Blocks, SW Park Apartments, 9330 SE Harold, and more

Next Portland

A permit is under review for an 11-story affordable housing development at 2059 SW Park Ave. Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. Includes associated site work.

Permits 83
article thumbnail

Rostokino by CLK Architects | Shopping centres

Architonic

The challenge was to develop a functional, contemporary, and economically effective solution in a short period of time. The operation was divided into different zones with complex coordination in between technical departments and the non-stop activity of the tenants.

Permits 98
article thumbnail

Metro Reports: Welby, Northbound 30 Collaborative, 4611 N Minnesota, and more

Next Portland

Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. No Modifications or Adjustments to required Zoning Code development standards are requested in this application. The FAR transfer process is allowed by the Zoning Code. No on-site parking.

Permits 89
article thumbnail

Metro Reports: Trinity Academy, Sandy Pine, 2791 NW Thurman, and more

Next Portland

A six unit development at NW 28th & Thurman designed by Skylab Architecture has been submitted for building permit review. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Metro Reports have moved to Portland Maps Reports. A and 33.825.025.A,

Permits 86
article thumbnail

GRUNER&FRIENDS Develop New SWISS LIFE – KPMG HQ

Architizer

The building was stripped down to its bare structure which is kept to retain the building’s zoning privileges. The building was stripped down to its bare structure which is kept to retain the building’s zoning privileges. The post GRUNER&FRIENDS Develop New SWISS LIFE – KPMG HQ appeared first on Journal.