article thumbnail

TAB 2024 installation programme

aasarchitecture

The winning proposal of the Installation Programme Competition will serve as a waiting area for the passengers of the local bus lines. The Installation Programme Competition aligns with TAB 2024’s main theme “Resources for a Future”, which was conceived by the curatorial team Daniel A. Walser, Anhelina L.

article thumbnail

Intelligent concealed installation from hansgrohe

Hotel Designs

The product has also been manufactured with the highest quality in mind, giving installers security in the product’s longevity and performance. “Installers are facing more demand and daily time pressures on the job than ever before,” explained Axel Meissner, Product Manager, Hansgrohe SE.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Ten must-see installations at London Design Festival 2023

Deezen

As London Design Festival returns for another year, we have selected some of the key installations and exhibitions to see as part of the 2023 edition. The installation, titled Aura, uses a pulsating light to represent sound waves to explore rituals and ceremonies.

article thumbnail

Archinect's Lexicon: "Generative Design"

Archinect

For this installment, we're featuring a term central to current conversations on how architects can use artificial intelligence in the design process. Generative design" is a technology-driven design process that employs algorithms and/or artificial intelligence (AI) to develop optimized design solutions.

Design 313
article thumbnail

RAK Ceramics upgrades sustainably sanitaryware manufacturing model

Hotel Designs

RAK Ceramics aims to begin installation of the new machinery in 2023, with the aim of going online in the first half of 2024. Main image credit: RAK Ceramics RAK Ceramics upgrades sustainably sanitaryware manufacturing model Hamish Kilburn.

article thumbnail

UK announces massive cladding remediation mandate in wake of Grenfell inquiry

Archinect

England's housing developers have been given an ultimatum - commit to repairing unsafe buildings or be banned from operating in the market. Developers now have six weeks to sign a government contract to fix their unsafe buildings from the past 30 years.

article thumbnail

Artefact uses bricks made from "unloved" stone to craft temporary shelter in Clerkenwell

Deezen

Architecture studio Artefact has created an installation at Clerkenwell Design Week using bricks made of stone , which the manufacturer claims emit 75 per cent fewer greenhouse gases than fired bricks in production. It's a modified bespoke machine originally designed to make paving stones," Paine told Dezeen. "We