article thumbnail

Sustainable Policy: How Deconstruction Policies Are Revolutionizing Construction Waste Management in the United States

ArchDaily

Several cities like Seattle and Pittsburgh , have started implementing deconstruction ordinances that require older buildings to be carefully deconstructed rather than demolished. In the United States , city organizations have begun to implement new policies to keep construction waste out of landfills and support circular practices.

article thumbnail

INNOCAD design deconstructed corten house overlooking Linz, Austria

Avontuura

Responding to the gentle slope, the house’s deconstructed volume is composed of three sections: a vertical, horizontal and floating section. The post INNOCAD design deconstructed corten house overlooking Linz, Austria appeared first on Åvontuura.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Deconstructed House / INNOCAD Architecture

ArchDaily

Completed in 2022 in Linz, Austria. Images by Paul Ott. Located in the hilly outskirts of Linz, the third largest city in Austria that is closely linked to the steel industry, this private residence was.

article thumbnail

Photographs capture the slow deconstruction of the Frank Erwin Center at the University of Texas at Austin

The Architect's Newsletter

This year’s SXSW in Austin was filled with hype: There was a drop from Icon, lots of AI speculation, the premiere of a movie about 4chan.org, and enough Army presence The post Photographs capture the slow deconstruction of the Frank Erwin Center at the University of Texas at Austin appeared first on The Architect’s Newspaper.

article thumbnail

Deconstruction of building made of alternative concrete resulted in just two buckets of waste

Archinect

Combining their sturdy panel-based construction system with their concrete alternative , Nexiite, which produces about 35% lower carbon emissions than conventional concrete , Nexii was able to deconstruct the showroom in six days, saving almost every part of the building for future reconstruction.

article thumbnail

joana vasconcelos deconstructs electricity heritage in plug-in show at MAAT lisbon

designboom

Joana Vasconcelos has established an […] The post joana vasconcelos deconstructs electricity heritage in plug-in show at MAAT lisbon appeared first on designboom | architecture & design magazine.

article thumbnail

a trio of rusted steel volumes forms this ‘deconstructed house’ in austria

designboom

The post a trio of rusted steel volumes forms this ‘deconstructed house’ in austria appeared first on designboom | architecture & design magazine. designed by INNOCAD architecture, the private dwelling is located in the scenic outskirts of linz, austria.