Remove mep-systems mechanical-systems
article thumbnail

What Are Shop Drawings and Their Significance?

The Architecture Designs

Unlike generic architectural or engineering plans, shop drawings delve into specific components, systems, or structures of a project, offering detailed instructions for fabrication, assembly, and installation.

article thumbnail

Formation Association fills revamped Los Angeles retail space with pink plaster

Deezen

Importantly, at the street elevation, when the existing standard height storefront glazing system was removed, along with layers of subsequent remodeling, large openings were revealed, which now comprise a key characteristic for the accessibility and porosity of the updated elevation," Formation Association founder John Chan told Dezeen.

Space 104
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Structural engineering solutions for office-to-residential conversion

BD+C

Issue 3: Structural design for mechanical, electrical, and plumbing Coordinate with the structural engineering team as you plan unit layouts, plumbing, and HVAC. A conversion will greatly impact existing and new MEP systems, so the structural team will need to account for new floor and wall openings for conduit, piping, and HVAC.

article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BD+C

rcassidy Mon, 06/05/2023 - 12:44 Andrew Lehrer and Tyler Jensen, Environmental Systems Design A significant climate impact can be achieved with hybrid electrification that balances capital expenditure and operating expenses. is a complex system that delivers power as it is produced. However, the average U.S.

Site 98
article thumbnail

Tech for Architects: 7 Top BIM Tools for Architectural Design

Architizer

BIM design software surpasses traditional 3D modeling programs by incorporating digital models with different data sets, such as material specifications, finishes and even MEP (mechanical, electrical, and plumbing) systems.

Architect 125
article thumbnail

Skylodge by Skylab

aasarchitecture

A series of modules, based on 100-square-foot triangles, were fitted out on site, including finish materials, as well as mechanical and electrical systems. Photo © Boone Speed Employing modular and prefabricated construction, enabled the construction timeline to be compressed into a brief five-month window.

article thumbnail

Adaptive reuse: 5 benefits of office-to-residential conversions

BD+C

Any conversion project requires critical consideration of the existing building conditions: the size of the floorplate, the placement of the building on the block, the viability of the MEP systems, even the condition of the window. Let's look at those five benefits of adaptive reuse, office-to-residential.