Three Pines by Resolution: 4 Architecture
Archinect
APRIL 26, 2024
On site, the local general contractor prepared the site and foundation for the arrival of six prefab modules. After the modules were delivered and set into place, the on-site contractor secured it to the foundation and closed up the mate-line conditions - seaming together the roof, walls, and floors.
Let's personalize your content