Remove projects yard-1
article thumbnail

The cost of LA River Park's Taylor Yard G2 project could surpass $1 billion according to new Bureau of Engineering study

Archinect

The cost to turn 42 acres of contaminated railroad property on the border of Cypress Park and Glassell Park into a "crown jewel" of riverfront revitalization could top $1 billion. That's according to an updated study by the Bureau of Engineering that will be reviewed today by a City Council committee. million, whi.

article thumbnail

New York to introduce ‘first-in-the-nation’ mandate for concrete emissions

Archinect

The plan contains mandatory rules for establishing emissions limits on concrete used in state-funded public building and transportation projects. ” The measure will apply to state agency contracts exceeding $1 million that involve the use of more than 50 cubic yards of concrete. Exceptions are provided f.

Contract 292
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Featured architecture jobs this week at KPF, Perkins Eastman, Dattner, and Brooks + Scarpa

Archinect

10 & 30 Hudson Yards by Kohn Pedersen Fox Associates (KPF). 10 & 30 Hudson Yards by Kohn Pedersen Fox Associates (KPF). Photo: Connie Zhou Global design firm Perkins Eastman has three opportunities across its offices in Chicago, San.

Photoshop 317
article thumbnail

The axolotl by Yu2e, Inc.

Archinect

This is a project developed under the TOC (transit oriented communities) standards. It is intended to spur multi-family development near public transit by relaxing restrictions like required yards, parking and density maximums or floor area in exchange for setting aside some of those units for lower income households and tenants.

Roofing 362
article thumbnail

Frank Gehry & OLIN break ground on new LA River revitalization Headwaters Pavilion

Archinect

The pavilion is the spearhead of the new “kit of parts” LA River revitalization master plan that was adopted by the county in May and includes the $1 billion-plus Taylor Yard G2 site and a total of 22 other new projects spread along the 51-mile-long course stretching from the San Fernando Valley to its southern terminus in San Pedro.

article thumbnail

MVRDV completes yellow office retrofit with zigzagging outdoor staircase

Deezen

Dutch studio MVRDV has unveiled Haus 1, a bright yellow workplace adapted from a 1990s office building in Berlin with local studio Hirschmüller Schindele Architekten. A CLT extension occupies the rooftop Haus 1 was commissioned by the developer Fabrix.

article thumbnail

Piiri wooden housing block // Tommila Architects

Architizer

Project Status: Concept. © KVANT-1 / Architecture: Tommila Architects and Kaleidoscope. © KVANT-1 / Architecture: Tommila Architects and Kaleidoscope. © KVANT-1 / Architecture: Tommila Architects and Kaleidoscope. © KVANT-1 / Architecture: Tommila Architects and Kaleidoscope. Size: 3000 sqft – 5000 sqft.

Housing 87