A Ravishing Live/Work Space in Brussels Is Finished With Soils Collected From Building Sites
Dwell
MARCH 21, 2023
The roof extension is built in a timber frame structure with exposed beams. The roof extension is built in a timber frame structure with exposed beams. Clay plaster and rammed earth from the waste soil of Brussels building sites are used for finishing. Straw bales from a nearby farm were chosen as the insulation material.
Let's personalize your content