Remove Developer Remove Foundation Remove Permits Remove Site
article thumbnail

Construction starts at SOM-designed 400 Lake Shore Drive replacement in Chicago

Archinect

The much-publicized void left behind in the wake of Santiago Calatrava ’s failed Chicago Spire proposal is finally being attended to, as now the Chicago Sun-Times and other outlets are reporting on developer Related Midwest’s start of construction for the SOM -designed replacement at 400 Lake Shore Drive.

article thumbnail

Metro Reports: NW 23rd and Marshall, Zeal Lofts, 2251 SE 92nd, and more

Next Portland

A building permit is under review for the NW 23rd and Marshall Apartments, designed by GBD Architects. Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. We publish the highlights. Maintain existing SFR.

Permits 95
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Revitalizing a Contaminated Site: The Ford Calumet Environmental Center

Architizer

miles from the site. The cost of bringing a sanitary sewer to the site was $2.0M – threatening the viability of the entire development. Working with our civil and plumbing engineers, we developed a design for an on-site black water treatment system where the outflow was clean water.

Site 73
article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

Metro Reports: North 18, Choice Cambria Portland, 8736 N Willamette, and more

Next Portland

The first building permit has been issued for North 18. Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. 55,000 sf affordable residential building (100% at 60% AMI) and associated site work.

Permits 65
article thumbnail

Metro Reports: Lincoln Court, Powellhurst Apartments, Shift Apartments, and more

Next Portland

Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Stormwater via drywell on site. 21-113731-MT MT* The STR system includes concrete foundation and slab on grade with wood frame walls, pre-engineered floor joists & trusses.

Permits 82
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: Project Scale: The CGN New Research Center, which consists of 2 plots, covers a total site area of 71752.4?. The Plot I, land for scientific research, covers a site area of 33861.6?,