article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Of course, each project is unique and complex sites or functional requirements can add additional costs to these elements. The hard cost of construction is typically the cost for construction of the building, materials, labor, basic site work, and the general contractor’s fee.

article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

555 Ocean Ave (Newport, Rhode Island) In previous Archi-TEXT articles it was discussed the value of an architect to help you navigate the various phases of the design of a new home or building or the renovation of an existing one, but what are the various phases of the architectural design process?

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

have in store for interested design professionals, contractors, subcontractors, and suppliers. LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project.

Project 215
article thumbnail

The practical magic of the design process

BD+C

That’s Craig’s summary, and it aligns with what he calls one of the most exciting parts of the design process, which is “translating something intangible into something tangible.” Standard design projects rely on a three-phase approach: Schematic design Design development Construction documents Schematic design is about the “big idea.”

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

The architect will begin space planning, land zoning, and business zoning for the site, and create estimations for the cost and timeframe of the project. All the logistics must be figured out before they can move on to design concepts and proposals. They will then submit them to the planning authorities for approval.

article thumbnail

Steven Holl's 'intersecting spheres' scheme for Taipei necropolis gets green light

BD+C

The schematic design has been approved for the 50 000-sm Arrival Hall and Oceanic Pavilion for the Taiwan ChinPaoSan Necropolis. Set on an ocean-view site 40 minutes from Taipei, the arrival hall and pavilion will serve the historic complex, which has more than 10,000 existing burial sites. Body Image: read more.