Remove Contractor Remove Diagram Remove Schematic Design Remove Site
article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

555 Ocean Ave (Newport, Rhode Island) In previous Archi-TEXT articles it was discussed the value of an architect to help you navigate the various phases of the design of a new home or building or the renovation of an existing one, but what are the various phases of the architectural design process?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Even overhead charges, and the contractor’s profit margin. So that general contractors use it when bidding on building projects. Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design. WBS Diagram. These expenses include direct costs and associated expenses.

article thumbnail

The Best Architect Exam Prep Resources

The Architect's Guide

Project, Planning, & Design (PPD). Project Planning & Design (PPD) is an exam that tests your ability to design sites and buildings. It should be called “Schematic Design.” Expect to get scenario based questions on issues related to programming, site analysis, and zoning and code requirements.