Remove Contractor Remove Estimating Remove Schematic Design Remove Site
article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

The process of estimating projects might be very complicated. You need funds to purchase supplies, and design drawings. That is why careful construction estimates are necessary to ensure nothing gets overlooked. To overcome these complications, you need to have the best Construction Estimating Services.

article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

have in store for interested design professionals, contractors, subcontractors, and suppliers. LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project.

Project 217
article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

The architect will begin space planning, land zoning, and business zoning for the site, and create estimations for the cost and timeframe of the project. All the logistics must be figured out before they can move on to design concepts and proposals. They will then submit them to the planning authorities for approval.

article thumbnail

Becoming an Architect: What You’ll Need to Know

Young Architect

Reviewing the work of contractors, so they can get paid, . Sure, sometimes designing and drawing pretty pictures are part of an Architect’s day, but that’s really just a very small piece of every project. After we solved the design problem, the next 11 months were spent… . Working on construction drawings. Invoicing clients, .

article thumbnail

Back to the Garden

Landscape Architecture Magazine

The beat goes on at the Bethel Woods Center for the Arts in Upstate New York, the site of the legendary 1969 Woodstock music festival. At the same time, it’s a historic site with a small museum telling the story of the momentous happening here 53 years ago and providing programs related to that history. By Jane Margolies.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Campus map showing the various sites considered during the site selection process. The site selection process proved eye-opening. We studied several candidate sites, but the Steering Committee ultimately chose one that wasn’t initially on anyone’s radar screen. While more challenging to work with than the others, Site N.3

Building 205