article thumbnail

MIT Site Plans and Diagrams

Visualizing Architecture

I also generated a before and after semi-photoreal illustration of the site plan. Plus, I like the visual contrast of the abstract diagrams next to the realistic illustrations of the site. Sometimes, especially with diagrams, shadows can be distracting and impact clarity so I wanted to have both options ready to go.

Diagram 52
article thumbnail

Craig Steely Architecture tops Musubi house in Hawaii with dramatic roof

Deezen

There are practically no doors in this Hawaii retreat by Craig Steely Architecture that has a triangular inner courtyard , massive skylight and a cantilevered roof. It is sited amongst 100 acres of grassy, rolling hills, facing North on the slopes of the Mauna Kea volcano in Pa'auilo, on Hawaii's Big Island. "The

Roofing 111
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Skyscraper at 210 North Morgan Seeks Approval

Chicago Architecture

Net site area: 17,591 square feet. Roof height: 360 feet. Roof decks: 4th and 29th floor (north facing). Roof decks: 4th and 29th floor (north facing). Green roof: 2,628 square feet. November, 2021 diagram of 210 North Morgan. November, 2021 diagram of 210 North Morgan. Floor area ratio: 11.5 (7.0

Diagram 98
article thumbnail

StudioAC disguises rural Canadian home as agricultural shed

Deezen

StudioAC has created a house in a wooded area called Devil's Glen "The design process began with an on-site picnic, where a discussion focused more on the natural elements of the site rather than the building," explained the studio. That conversation inspired the ethic of the project to come," it continued.

Home 145
article thumbnail

Studio Bark devises structural use for waste timber in English woodlands

Deezen

British architecture practice Studio Bark has worked with students from the University of East London to devise a roof-supporting column with otherwise unusable timber at a site within ancient English woodland. If you were to draw a force diagram, you'd need more material in the middle, so naturally it's a win-win," she said.

Structure 128
article thumbnail

Nanjing K.Wah G72 by UNStudio

aasarchitecture

The site is separated by the central river and the planned road into 4 plots which are set to create a dynamic community for locals and visitors. Building Integrated Photovoltaic, BIPV solutions installed on the roofs of all buildings will meet the daily energy demand of the buildings and further reduce operation and maintenance costs.

Diagram 84
article thumbnail

Mass Timber Logistics Hub in Netherlands by Henning Larsen

aasarchitecture

Biogenic materials and significantly increasing biodiversity are prioritized – over 40% of the site is dedicated to its landscape, inspired by the surrounding island habitat. Additionally, roof-sourced stormwater can be efficiently recycled for internal building use. The site is set to be completed in 2026.

Diagram 69