Remove Contract Remove Contractor Remove Engineering Remove Installation
article thumbnail

Gehry Partners references icebergs and Hollywood for Warner Bros building

Deezen

Warner Bros contracted international architecture studio NBBJ for the interior fit-outs. Photovoltaic panels are installed on the roof. Structural consultant: Englekirk Civil engineer: Psomas Elevator consultant: HKA Elevator Consulting, Inc. These are complete with paths that meander through groves of mature trees and shrubs.

Building 135
article thumbnail

Method Architecture outfits its Houston office with vibrant mural

Deezen

Light grey flower-like acoustic baffles hang from the ceiling "This feature piece of artwork helps set the tone for the remainder of the office including bold colors, geometric patterns and shapes and a secondary mural designed and installed by Maldanado featuring drip paint in mirroring colorways located at the back of the office," the team said.

IT 125
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Holland Casino Venlo by MVSA Architects

aasarchitecture

Landscape Contractor: De Enk Groen en Golf Client: Holland Casino Gross floor area: 9.899 m2 Gross floor area urban design: 28.000 m2 Completion: 2021 Photographs: Corné Clemens , Laurens Eggen , Jan Maarten Lieverdink, Barwerd van der Plas , Courtesy of MVSA Architects. Interactive LED Facade: Livingprojects B.V.

article thumbnail

Holland Casino Venlo by MVSA Architects

aasarchitecture

Landscape Contractor: De Enk Groen en Golf Client: Holland Casino Gross floor area: 9.899 m2 Gross floor area urban design: 28.000 m2 Completion: 2021 Photographs: Corné Clemens , Laurens Eggen , Jan Maarten Lieverdink, Barwerd van der Plas , Courtesy of MVSA Architects. Interactive LED Facade: Livingprojects B.V.

article thumbnail

Crisis in the Profession

Architects Tales

Contractor’s specification: Pound to Fit, Paint to Match Annoymous. Second, no third party could have standing to sue the architect because it lacked “privity” of contract and any tort exposure to third party law suit evaporated when the project was completed. Blog Story No. It is hard to say when the crisis began. More Change.

article thumbnail

Gensler and WOOD-SKIN Breathe New Life into the Ballston Point Office Space

Architizer

We work as an extension of the firm’s team, in this case, the initial concept has been developed by the Gensler Team; WOOD-SKIN participated in the early stage of the design by re-modeling suggestions from the original concept and engineering such suggestions with our bio-mimicry knowledge and software. © WOOD—SKIN.

Space 66
article thumbnail

Icaro Hotel by MoDusArchitects

aasarchitecture

Location: Piz 18/1, Alpe di Siusi, Castelrotto, Italy Architect: MoDusArchitects Project Team: Sandy Attia, Matteo Scagnol, Filippo Pesavento Structural Engineer: Ing. Ulrich Kauer (KS Engineering) Mechanical Engineer: Ing. Kurt Tröbinger (KTB Engineering) Electrical Engineer: Ing.