Remove Commercial Remove Permits Remove Utilities Remove Zoning
article thumbnail

Discretionary Permitting: What Homeowners Need to Know

Santa Cruz Architect

The discretionary permitting process is often used by local governments to ensure that proposed land uses are compatible with existing land uses, and that they do not pose an undue risk to public health, safety, or welfare. as to whether or not the permit should be granted. as to whether or not the permit should be granted.

Permits 79
article thumbnail

Rostokino by CLK Architects | Shopping centres

Architonic

The operation was divided into different zones with complex coordination in between technical departments and the non-stop activity of the tenants. The facade design includes a corporative identity and consists of a prefabricated system of panels where commercial brands can utilize the space.

Permits 98
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Metro Reports: Pop Blocks, SW Park Apartments, 9330 SE Harold, and more

Next Portland

A permit is under review for an 11-story affordable housing development at 2059 SW Park Ave. Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. Building B consists of seven 2-story town homes totaling 7,452SF.

Permits 83
article thumbnail

Skidmore, Owings & Merrill (SOM) Design Iconic External Diagrid for Shenzhen Rural Commercial Bank Headquarters

Architizer

Shenzhen Rural Commercial Bank Headquarters is the new home for a bank that has grown from a rural credit union into a modern commercial bank. The building was designed to “breathe” and flex to occupant needs, utilizing naturally ventilated atria and a column-free externalized structure. Project Status: Built. Year: 2020.

article thumbnail

Metro Reports: Con-way Block 290, Timberview, Multiple Pathways to Graduation, and more

Next Portland

Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. The new building will have 105 dwelling units and a ground floor commercial space planned as a food hall / restaurant incubator space. Metro Reports have moved to Portland Maps Reports.

Permits 82
article thumbnail

Adams Van Lines Presents: The Guide to Minimalist Packing for Effortless Relocation

The Architecture Designs

Allocating Packing Zones for Efficiency: Organize your packing process by designating zones for different categories of items. Decluttering and Downsizing source: pinterest.com Effective Decluttering Techniques: Utilize techniques like the KonMari method or the 90/90 rule.

article thumbnail

Metro Reports: PCC Metro Center, Market Street Apartments, 5802 SE 92nd, and more

Next Portland

The new PCC Metropolitan Workforce Training Center, designed by Bora Architects, has been submitted for building permit review. Every week, the Bureau of Development Services publishes lists of Early Assistance applications, Land Use Reviews and Building Permits processed in the previous week. 2 Off-street loading zones.

Permits 67