article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. Project credits: Planning/Urban Design: Page (TCCMP) Architect: Master Architect/Engineer: Page, AOR for George HW Bush Building: HKS, Inc., & Elec. (AOR & Elec.

Utilities 117
article thumbnail

University of Arizona Health Sciences Innovation Building // CO Architects

Architizer

Martin Associates – Structural Engineer – KGM Architectural Lighting – Lighting – CO Architects – Design Architect & Architect of Record. CO Architects: Executive & Design Architect; Swaim Associates: Associate Architect.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Studio Gang designs Brooklyn fire station to train elite firefighters

Deezen

Civil engineer: Langan , civil engineer. Cost estimator: Toscano Clements Taylor. General contractor: ZHL Group. MEP & Fire protection: ads. Landscape architect: SCAPE. Wayfinding and signage consultant: Once–Future Office. Lighting consultant: Domingo Gonzalez Associates.

article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect. The primary role of any quantity surveyor is to manage a construction project’s costs and ensure the project is completed within the estimated budget.

Project 52
article thumbnail

Dairy Apartments Portland, Oregon

e-architect

Currently under construction, this residential property project’s estimated completion is March 2025. The resulting design includes two 7-story housing bars on a full-block, 2-story podium arranging ground-floor residential and amenity spaces around a central private courtyard.

article thumbnail

Morphosis completes terracotta-clad Orange County Museum of Art

Deezen

General contractor: Clark Construction Group. Structural engineer: John A. MEP engineer & sustainability: Buro Happold. Civil engineer: KPFF. Fire life safety engineers: Simpons Gumpertz & Heger. Cost estimator: Dharam Consulting. Architect: Morphosis. Martin & Associates.

Art 119
article thumbnail

W.M. Keck Science Center by SRG Partnership

aasarchitecture

Location: McMinnville, Oregon, USA Architect: SRG Partnership Civil Engineer: KPFF Structural Engineer: KPFF Mechanical, Electrical, Plumbing Engineer: PAE Landscape: Lango Hansen Lab Planner: Research Facilities Design Acoustics: Acoustics by Design AV: Spectrum Systems Design Cost Estimator: Rider Levett Bucknall (RLB) Contractor: Walsh Construction (..)