Remove Civil Engineering Remove Contractor Remove Estimating Remove Sustainability
article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

The Texas Capitol Complex was designed by Page Southerland Page Phase 1 – which is estimated as a $600 million investment – opened in 2022. The project's focus on sustainability and historic preservation shows Austin's dedication to protecting the environment and respecting its rich cultural legacy," Page said. & Elec. (AOR

Utilities 114
article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect. The primary role of any quantity surveyor is to manage a construction project’s costs and ensure the project is completed within the estimated budget.

Project 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Morphosis completes terracotta-clad Orange County Museum of Art

Deezen

General contractor: Clark Construction Group. Structural engineer: John A. MEP engineer & sustainability: Buro Happold. Civil engineer: KPFF. Fire life safety engineers: Simpons Gumpertz & Heger. Cost estimator: Dharam Consulting. Architect: Morphosis. Martin & Associates.

Art 118
article thumbnail

NADAAA Introduces a Panoptic Plan with a Tripartite Set of Wings for the Adams Street Branch Library

Architizer

How important was sustainability as a design criteria as you worked on this project? . A project slated for LEED Gold, sustainability was central to its design criteria and was systemically part of the review process. Structural: Souza True and Partners Civil Engineer: BSC Landscape: Ground, Inc. © John Horner.

article thumbnail

Diller Scofidio + Renfro creates performing arts centre on Massachusetts campus

Deezen

Contractor: Dimeo Construction. Civil engineer: Nitsch Engineering. Cost estimator: Dharam Consulting. MEP/FP engineer: Altieri Sebor Wieber. Structural engineer: Robert Silman Associates. Sustainability: Transsolar. Executive architect: Perry Dean Rogers. Code consultant: Code Red Consultants.

Art 105
article thumbnail

Prior Performing Arts Center at the College of the Holy Cross by Diller Scofidio + Renfro

aasarchitecture

IT/Security: Shen Milson & Wilke Landscape Architect: Olin Lighting: Tillotson Design Associates MEP/FP Engineer: Altieri Sebor Wieber Specifications: Construction Specifications, Inc. Structural Engineer: Robert Silman Associates Sustainability: Transsolar Theater Planning: Fisher Dachs Associates, Inc.

Art 52
article thumbnail

Little Rock Art Museum, Arkansas, USA

e-architect

Both inside and outside, the organic, curving form responds directly to the constraints of the existing structure and foundations, which were substantially preserved as part of the design’s sustainable approach. Additional Team Nabholz, Pepper, Doyne, Construction Manager/General Contractor. dbHMS, MEP/FP Engineer.

Art 50