Remove 2026 Remove Environment Remove Site Remove Structural Engineering
article thumbnail

Ervin Architecture unveils expansion of Maine's largest building

Deezen

2019 saw structural and infrastructural improvements In 2018, "quasi-permanent shipping container structures" were built as annexes offsite to house food and beverage facilities, and the permanent eastside foundation was poured allowing the installation of four shipping containers that housed the corporate club spaces.

article thumbnail

Opticum Research Building by HENN

aasarchitecture

The Opticum is an interdisciplinary research building for Leibniz University of Hanover currently under construction on the Science Park site located in the urban district of Marienwerder. Image © HENN Research involving laser beams and highprecision equipment requires a robust and safe environment.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Fulldraw Vineyard by Clayton Korte

aasarchitecture

Photo © Likeness Studio The 12,620-square-foot winery complex consists of three buildings: a 6,972-square-foot Fermentation Building and Barrel Aging and a 2,170-square-foot Case Good Storage area, plus a second phase hospitality building that should be complete by 2026.

article thumbnail

LA VIE in Muscat by 10 Design

aasarchitecture

Image © 10 Design For the golf-driven hospitality environments of today and tomorrow, designers are tasked with creating vibrant backdrops for social events and gatherings that will resonate with multifaceted, multigenerational audiences. The full structure is slated for completion at the end of 2024, with an anticipated opening of Q1 2026.

article thumbnail

Minerva House extension by Ben Adams Architects

aasarchitecture

The ground floor will feature a dynamic mix of retail, food options, and co-working spaces, while the middle floors will cater to more traditional office environments. The project will start on site in 2023 with completion expected in 2026. Source by Ben Adams Architects.

article thumbnail

Page Southerland Page integrates "past and future" at Texas Capitol Complex

Deezen

It improves the built environment of the city and offers useful amenities that allow the public and state agencies to interact in a shared area located in the heart of Austin." Phase 3 is projected to add another two buildings totalling 500,000 square feet (46,451 square metres). & Elec.

article thumbnail

Sanya Horizons by Büro Ole Scheeren

aasarchitecture

Winner of an international design competition, Ole Scheeren’s vision for a tropical resort complex framing the horizon of Sanya’s spectacular coastline is scheduled to open in 2026 to enhance the experience of the natural world. The beach is the focal point of every voyage to the resort city of Sanya. Image © Büro Ole Scheeren.