Remove projects ag-campus
article thumbnail

Life Science Advanced Research Center by HENN

aasarchitecture

Facing the city center, the building will be a cornerstone of the new research and development campus. This campus is being built along the so-called Innovation Mile marked at its southern end by the Innovation Center at Emanuel-Merck-Platz, which was also designed by HENN. Colored glass walls emphasize the laboratory areas.

article thumbnail

AMDL Circle and Iart wrap Basel pavilion in energy-neutral media facade

Deezen

Located alongside the Rhine at the campus of the Novartis healthcare company, the pavilion , which was recently shortlisted in the Dezeen Awards , has a communicative skin made from photovoltaics and LEDs. The media facade has a total of 10,000 solar modules with 30,000 embedded LEDs and consumes only as much power as it can produce.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Christ & Gantenbein Design a Non-Hierarchical Open Plan for Roche Multifunctional Workspace Building

Architizer

Project Status: Built. Our project boldly embodies this idea through an open-plan design that invites unrestrained movement through its radically column-free floors, providing natural light and vistas throughout. A spatial generosity defines the appearance of the project. Year: 2021. Size: 100,000 sqft – 300,000 sqft.

article thumbnail

Roche multifunctional workspace Grenzach-Wyhlen

e-architect

In September of 2021, after some two years of construction, the Multifunctional Workspace Building on the campus of the Roche Pharma AG in the southwest German town of Grenzach-Wyhlen, was officially declared open. Photos © Walter Mair. Roche Multifunctional Workspace, Germany.

article thumbnail

Top 10 tallest mass-timber buildings around the world

Deezen

While some of the projects have structures made entirely from mass-timber components, such as cross-laminated timber (CLT) and glued laminated timber (glulam), others introduce concrete and steel elements to build taller. Completed in 2020, the studio claims that the project is Australia 's first CLT extension.

Building 118
article thumbnail

Anne Mosseri-Marlio Galerie Andermatt Building

e-architect

We view this project as an opportunity to continue to engage in this digital realm and authentically share beautiful art and architecture to the viewer, while providing the artist a platform to showcase their work.”. University of Bern Muesmatt campus masterplan , Bern, Switzerland. University of Bern Muesmatt campus masterplan.

article thumbnail

Continental Headquarters by HENN

Archinect

As the eastern gateway to the city of Hanover, the new headquarters of Continental AG designed by HENN consolidates several functions previously spread across the city in a single location.