article thumbnail

Under Construction: Slabtown Savier (images)

Next Portland

I hope to return to more frequent updates to this site, although I cannot make any commitments. The site was most recently used as surface parking. Other buildings in the masterplan that have been completed in the Con-way Masterplan area include the LL Hawkins and Slabtown Marketplace , The Carson , Saltwood and the Leland James.

article thumbnail

University of Brighton Moulsecoomb Campus, Sussex

e-architect

University of Brighton Moulsecoomb Campus Masterplan, East Sussex Campus Building, Southern English Development Photos. University of Brighton Moulsecoomb Campus Masterplan. Hassell completes a transformational masterplan for the University of Brighton. University of Brighton Moulsecoomb Campus Masterplan Design.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Metro Reports: RiverPlace Redevelopment – Phase 1, Francis + Clare Place, Modera University District, and more

Next Portland

The project would include a 30-story tower with 385 residential units on the site of the former RiverPlace Athletic Club. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Stormwater will be managed on site in accordance w/ BES standards.

Permits 89
article thumbnail

Metro Reports: Willamette Blocks, OMSI Master Plan, 5112 SE Woodstock, and more

Next Portland

Building permits have been issued for the northern two blocks of the Willamette Blocks, which include a 6-story building with 232 residential units and a 23-story building with 340 residential units. Design work for the four-block development is by WDG Architecture for developer Alamo Manhattan. We publish the highlights.

Permits 67
article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

Fairyland Guorui | UNStudio

ArchiDiaries

The site is situated on a plot where two rivers converge, surrounded by natural scenery and mountain views. The public spaces within and adjacent to the complex follow the design philosophy in the master plan and respond to the site’s context in the waterside location. Facade design. Sustainability.

Permits 74
article thumbnail

HarborPlace: How not to make a deal

Community Architect Daily

The bills are intended to create the zoning necessary to permit the proposed size of the project which cannot be built with the existing Urban Renewal Plan and current zoning in place. Or look at the former News American site, that has sat as a parking lot on prime land right across from HarborPlace for 40 years.