Remove Diagram Remove Structure Remove Visualization Remove Zoning
article thumbnail

View Corridors

SW Oregon Architect

They are meant to preserve visual connections between key landmarks, natural features, or other important elements of a cityscape. In the context of urban planning, municipalities implement view corridors through zoning regulations, building height restrictions, and other planning measures. Vancouver view corridor diagram.

article thumbnail

7 Top AI Tools for Generating Smart Architectural Plans

Architizer

Architizer’s Tech Directory is a database of tech tools for architects — from the latest generative design and AI to rendering and visualization , 3D modeling , project management and many more. The spatial data can then become visually represented through graphs, charts and geo-referenced locations placed on a map.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Eugene/Architecture/Alphabet: O

SW Oregon Architect

Because it was an unreservedly plain and straightforward design strapped by a miserly budget, BOORA chose to rely upon the superficial application of a distinctive exterior color scheme to provide Olive Plaza with visual interest. Popular at the time of its construction, the lift slab technique has since fallen from favor.

article thumbnail

Craig Steely Architecture tops Musubi house in Hawaii with dramatic roof

Deezen

The diagram of the house is simple—an outdoor triangle within an indoor triangle supporting a diamond-shaped roof," said Craig Steely Architecture. The triangle-shaped atrium in the center provides an outdoor room between these zones with a floor of cut Pahoehoe lava," said Craig Steely Architecture.

Roofing 103
article thumbnail

The Connector by Gruppa Studio & Anagram A-U wins competitiion for reconstruction of the Town Hall in P?erov

aasarchitecture

The building is composed of a repeated structural system – a concept that delivers flexibility and efficiency. The ground floor is the most public zone of the proposal and accommodates the majority of the meeting spaces between citizens and administration officers. Image © Gruppa Studio & Anagram A-U. Location: P? Site Plan.

Zoning 95
article thumbnail

Schmidt Hammer Lassen wins competition for transformation and expansion of Helsingborg Library

aasarchitecture

A symbiosis of old and new, past, present, and future Respect for the existing structure, the park landscape, and the position that Helsingborg City Library already holds in the city has been the driving force behind SHL’s winning proposal. The expected start of construction is late 2025. Source by Schmidt Hammer Lassen.

Diagram 59
article thumbnail

ARC’TERYX Store by STILL YOUNG

aasarchitecture

It offers a buffer zone between the dry area and the outdoor wet snowfield, to enhance customer experience. With its crystal texture neutralizing the warm spatial tone, it becomes a visual focus. The area from the entrance to the foyer is a retail zone. Photo © SFAP. Photo © SFAP. The veranda performs practical functions.

Zoning 52