Remove Developer Remove Engineering Remove Foundation Remove Site
article thumbnail

HawkinsBrown completes transformation of historic Central Foundation Boys' School

Deezen

Founded in 1866, the Central Foundation Boys' School features a selection of historic buildings, such as a chapel that the studio converted into arts-focused teaching spaces. The sports hall is sunken seven metres below the ground in response to the compact size of the site. The photography is by Jack Hobhouse.

article thumbnail

First concrete poured for One Delisle’s raft foundation

Brandon Donnelly

This past week we poured the first bit of concrete in the giant rat slab foundation (or mat foundation) that sits, or will sit, at the bottom of One Delisle. You need to be on site and down in the bottom of the hole to really feel it. So the job of this giant slab is as a mat foundation. What do I know?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Bofill Foundation Headquarters, Barcelona, Spain

e-architect

The firm is firmly committed to integrating sustainability, technological innovation, off-site construction, and local craftsmanship in its projects, aiming for the highest certifications. Built in 1850, the 21x21m block stands as a testament to the industrial architecture of its time, representing a protected heritage example.

article thumbnail

GO'C places arts centre on former Seattle gas station site to "heal an urban problem"

Deezen

Developed in collaboration with the artist collective SuttonBeresCuller, Mini Mart City Park is a "community-focused pocket park and cultural center" meant to be a gathering place for the community in and around the Georgetown neighbourhood in Seattle. Remediation systems were added to the foundation to "clean the residual contaminants".

Site 114
article thumbnail

Revitalizing a Contaminated Site: The Ford Calumet Environmental Center

Architizer

miles from the site. The cost of bringing a sanitary sewer to the site was $2.0M – threatening the viability of the entire development. Working with our civil and plumbing engineers, we developed a design for an on-site black water treatment system where the outflow was clean water.

Site 73
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: Project Scale: The CGN New Research Center, which consists of 2 plots, covers a total site area of 71752.4?. The Plot I, land for scientific research, covers a site area of 33861.6?,

article thumbnail

Killa Design's Museum of the Future opens in Dubai

Deezen

Built for the Dubai Future Foundation , the seven-storey building contains a combination of exhibits dedicated to the future and workshops for testing and developing emerging technology. The photography is courtesy of Dubai Future Foundation. Project credits: Client: Dubai Future Foundation. Developer: North25.