article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

This can establish “grandfathered” conditions that may apply to new project and impact planning and zoning calculations. These may be done with simple hand sketches, Sketch-Up models or even Computer Assisted Design (CAD) drawings, but they will tend to be very diagrammatic and simple.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

The architect will begin space planning, land zoning, and business zoning for the site, and create estimations for the cost and timeframe of the project. Architects in South Africa will need to work within the land zoning laws concerning environmental protection and commercial space development.

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

have in store for interested design professionals, contractors, subcontractors, and suppliers. LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project.

Project 220
article thumbnail

The Best Architect Exam Prep Resources

The Architect's Guide

Project, Planning, & Design (PPD). Project Planning & Design (PPD) is an exam that tests your ability to design sites and buildings. It should be called “Schematic Design.” This exam is five long hours of you applying all of your critical design thinking to show that you can properly design a project.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

The HVAC design is comprised of a Dedicated Outside Air System (DOAS) with energy recovery and fan-coil units for zone heating and cooling. Fortis Construction is the Construction Manager/General Contractor (CM/GC) for the project. Overall, the project is on track to achieve LEED Gold certification.

Building 209
article thumbnail

Back to the Garden

Landscape Architecture Magazine

(Westlake Reed Leskosky eventually replaced Meier, whose pavilion design was ultimately deemed too expensive.) Gerry and his team wisely opted not to build on the Woodstock concert field—that was “a no-touch zone,” Sanders says. Our paving contractor said, what if?” And we thought the idea was cool and let him do it.”