Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

This can establish “grandfathered” conditions that may apply to new project and impact planning and zoning calculations. These may be done with simple hand sketches, Sketch-Up models or even Computer Assisted Design (CAD) drawings, but they will tend to be very diagrammatic and simple.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

The most successful projects though are the ones where we fully understand the people living and working within the architecture we design. Before we grab the roll of trace and start sketching with the Sharpie, we gather as much information about the users of our buildings as possible. Build rapport with the contractor.

article thumbnail

Entrepreneur Architect Academy 012 | My 10 Rules for Better Project Management

EntreArchitect

The most successful projects though are the ones where we fully understand the people living and working within the architecture we design. Before we grab the roll of trace and start sketching with the Sharpie, we gather as much information about the users of our buildings as possible. Build rapport with the contractor.

article thumbnail

Successful Project Planning for Small Firm Architects (Transcript)

EntreArchitect

Phase one of the of that project might be, let’s say schematic design and we’re going to say it’s gonna take three months and it’s going to be worth 30 percent. The same goes for tracking time, managing expenses, collaborating with contractors and viewing financial reports. So 30, $30,000.