Remove Contractor Remove Schematic Design Remove Site Remove Structure
article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Of course, each project is unique and complex sites or functional requirements can add additional costs to these elements. The hard cost of construction is typically the cost for construction of the building, materials, labor, basic site work, and the general contractor’s fee.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

555 Ocean Ave (Newport, Rhode Island) In previous Archi-TEXT articles it was discussed the value of an architect to help you navigate the various phases of the design of a new home or building or the renovation of an existing one, but what are the various phases of the architectural design process?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

The architect will begin space planning, land zoning, and business zoning for the site, and create estimations for the cost and timeframe of the project. All the logistics must be figured out before they can move on to design concepts and proposals. They will then submit them to the planning authorities for approval.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

ACLA Redesigns Buhl Community Park and Emphasizes the Importance of Community Connection

Architizer

Buhl Community Park – After winning a national competition to redesign the plaza in front of the Pittsburgh Children’s Museum ACLA began to work on integrating our design concepts with the physical realities and cultural context of the site. The essence of the design remained essentially enact through construction.

article thumbnail

The National Speed Skating Oval or the Ice Ribbon by Populous

aasarchitecture

Ltd Site Area: 17 hectares Gross Floor Area: ? Ltd Client: Beijing State Asset Management Co. Ltd Client: Beijing State Asset Management Co. Ltd (BSAM) Owner: Beijing National Speed Skating Oval Management Co.,

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Even overhead charges, and the contractor’s profit margin. So that general contractors use it when bidding on building projects. Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design. No structure is constructed without their skills. WBS Diagram.