Remove Contractor Remove Engineering Remove Schematic Design Remove Structure
article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget. Extensive decks, patios, pools, and outdoor living spaces should be considered in a holistic budget during the schematic design phase.

article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

The resulting design solution was developed based on physical assessments of the architectural, electrical, mechanical, and structural systems, which dovetailed with conceptual plans dedicated to student and faculty success.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

All the logistics must be figured out before they can move on to design concepts and proposals. Schematic Design Phase: Design Proposal Once the pre-design phase is complete, the architect can move on to the design proposal. They will then submit them to the planning authorities for approval.

article thumbnail

ACLA Redesigns Buhl Community Park and Emphasizes the Importance of Community Connection

Architizer

Our initial competition entry showed circulation pathways were a much more literal interpretation of the river concept with flowing curved edges and pier like structures extending over them. The essence of the design remained essentially enact through construction. © Andrea Cochran Landscape Architecture. Consultants.

article thumbnail

Woven Designs L Shape Vacation Home Vertes Retreat

Architizer

Thankfully, Jenkins Construction (the General Contractor), owner and designers resolved to continue with all aspects of the project as efficiently as possible. How did the context of your project — environmental, social or cultural — influence your design? Structural coordination on the project was significant.

Home 68
article thumbnail

Behind The Design 006: Get Space Vancouver by Jarod Hall of di’velept design

EntreArchitect

di’velept design. Project Design Team. AAI Engineering (Civil). HW Engineering (Structural). What type of fee structure did you use on this project? Is that your preferred fee structure? Which design software was used for this project? With contractor? Project Location. Jarod Hall.

Space 52