A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

If parts of the building are to be maintained then it is especially important to get a complete documentation of the structure. These may be done with simple hand sketches, Sketch-Up models or even Computer Assisted Design (CAD) drawings, but they will tend to be very diagrammatic and simple.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

All the logistics must be figured out before they can move on to design concepts and proposals. Schematic Design Phase: Design Proposal Once the pre-design phase is complete, the architect can move on to the design proposal. This phase can take considerable time, depending on building permit wait times.

article thumbnail

Becoming an Architect: What You’ll Need to Know

Young Architect

Reviewing the work of contractors, so they can get paid, . Sure, sometimes designing and drawing pretty pictures are part of an Architect’s day, but that’s really just a very small piece of every project. After we solved the design problem, the next 11 months were spent… . Working on construction drawings. Invoicing clients, .

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Even overhead charges, and the contractor’s profit margin. So that general contractors use it when bidding on building projects. Also includes quality control, protection, utilities, administration, legal fees, and permits. Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Fortis Construction is the Construction Manager/General Contractor (CM/GC) for the project. From the outset of their involvement at the beginning of Phase 2, the company provided invaluable cost estimating, value engineering, constructability review, and design coordination assistance. Rendering of the proposed multipurpose classroom.

Building 206
article thumbnail

Better Project Management for Small Firm Architects

EntreArchitect

They may be documented as formal systems or they may just be a general understanding of “how we do it here”. When a process is fully developed into a system with supporting documents of forms and checklists, it allows us to focus more on the details and development of a successful design. Listen carefully.