Remove Contract Remove Document Remove Information Remove Permits
article thumbnail

The Role of Architects in Construction Projects

Santa Cruz Architect

Architectural services can be obtained from unlicensed persons, but they cannot call themselves architects and generally, with the exception of single-family residences, they cannot sign construction documents. Documentation and Drawings. Roles of Architects in Construction. Cost Estimation. Construction Stage.

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

2) Cooperate with the design development and the construction document design to realize the project effect. The foundation pit construction document design is allowed to be sub-contracted. 2) The winner shall submit the foundation pit construction documents that meet the requirements of the approval before July 30, 2022. (3)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Basic Steps For Creating An ADU

Santa Cruz Architect

If you have an existing ADU that is not currently legally permitted, you may find that some of these steps may not apply to you as you go through the process of obtaining city approval and getting your ADU registered. For example, you may only find that you need to prepare a design and apply for ADU and/or building permit approval.

Permits 64
article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

If parts of the building are to be maintained then it is especially important to get a complete documentation of the structure. The next phase is “Construction Documentation.” South & West Proposed Elevations (555 Ocean Ave, Newport, RI) The next phase is known as “Bidding, Negotiation and Permitting.”

article thumbnail

Becoming an Architect: What You’ll Need to Know

Young Architect

fine tuning that design, creating construction drawings, specifications, details, getting cost estimates, solving code issues, obtaining building permits, supporting the contractor with information during construction, responding to unforeseeable conditions, working with and coordinating furniture, IT, and moving consultants. .

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

2) Cooperate with the design development and the construction document design to realize the project effect. The foundation pit construction document design is allowed to be sub-contracted. 2) The winner shall submit the foundation pit construction documents that meet the requirements of the approval before July 30, 2022. (3)

article thumbnail

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

BD+C

Stephen Blumenbaum, PE, SE, Walter P Moore Contractors Designers Designers / Specifiers / Landscape Architects Engineers Facility Managers Architects Building Owners AEC Tech BIM and Information Technology Building Tech Structural Materials Steel Buildings Today’s fast-paced world of design and construction is fractured.