article thumbnail

Behind The Design 005: River House by H. Sloane Mayor of UK Architects

EntreArchitect

Consultants. Firm Address. What was the process for permitting? The permitting was straight forward but not simple – we needed both a building permit and a wetlands administrative permit through the town of Hanover and a state of NH shoreline protection permit. Project Name. River House.

Permits 52
article thumbnail

Behind The Design 006: Get Space Vancouver by Jarod Hall of di’velept design

EntreArchitect

EntreArchitect: Behind the Design is a weekly blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. Consultants. What was the process for permitting? The land use permit took a couple of months. Click here to learn how.

Space 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Behind the Design 002:HillHouse by Zack / de VitoArchitecture + Construction

EntreArchitect

Consultants. Firm Address. We bough the old house with permits based on a terrible, contractor prepared set of drawings, we were able to start work right away, but we changed everything so we were always behind. What was the process for permitting? Zack/de Vito Architecture + Construction. Architect’s Name. Website URL.

article thumbnail

EntreArchitect Behind The Design 009: SteelHouse 1&2 by Zack/de Vito Architecture & Construction

EntreArchitect

EntreArchitect: Behind the Design is a weekly blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. Consultants. Firm Address. What was the process for permitting? Click here to learn how. Project Name. San Francisco, CA.

article thumbnail

Behind the Design 001: Calender Rd. by Allen Architecture, LLC

EntreArchitect

Consultants. Firm Address. What was the process for permitting? The permit review for Arlington is set up for production builders (masonry requirements, garage requirements, checklist of required “architectural facade elements”, etc.) This was not discovered until permitting. Arlington, Texas.

Permits 52
article thumbnail

EntreArchitect Behind The Design 008: Soaring Wings by Winn Wittman

EntreArchitect

EntreArchitect: Behind the Design is a weekly blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. Consultants. What was the process for permitting? I handled permitting myself. Click here to learn how. Project Name.

article thumbnail

Behind The Design 003: Canal House by The Ranch Mine

EntreArchitect

Consultants. Firm Address. What was the process for permitting? We submitted the plans and permitting took about 2 months, a pretty standard timeline for the City of Phoenix. Project Name. Canal House. Project Location. Phoenix, AZ. The Ranch Mine. Architect’s Name. Cavin Costello. Project Design Team. Website URL.

Mining 52