Remove Construction Remove Estimating Remove Schematic Design Remove Site
article thumbnail

Re-framed Initiative – Study of Retrofit Schematic Designs

Westeck News

This is achieved through the selection of low-carbon construction materials, installation of highly efficient technologies (like heat pumps) and integration with a supply of clean energy. > Minimizing on-site construction and disturbance to occupants. > > Enabling the addition of new floor(s) and/or unit(s). >

article thumbnail

Steven Holl and SKUPINA-designed Terezín Ghetto Museum advances

Archinect

The firm was named the winner of an international competition to design an extension of the existing museum in 2022 and will deliver the project on the site, which was first constructed as a citadel in 1780. The Schematic Design phase was completed in March.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

The process of estimating projects might be very complicated. You need funds to purchase supplies, and design drawings. That is why careful construction estimates are necessary to ensure nothing gets overlooked. To overcome these complications, you need to have the best Construction Estimating Services.

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: Project Scale: The CGN New Research Center, which consists of 2 plots, covers a total site area of 71752.4?. The Plot I, land for scientific research, covers a site area of 33861.6?,

article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Tender Condition The Tender for Schematic Design and Foundation Pit Design of CGN New Research Center (Tender No.: Project Scale: The CGN New Research Center, which consists of 2 plots, covers a total site area of 71752.4?. The Plot I, land for scientific research, covers a site area of 33861.6?,

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

The large amount of work hardly surprises us anymore, as the design and construction industries have proven remarkably resilient despite the economic and social turmoil we have endured since early 2020. government during the Second World War. billion during the past biennium.

Project 217