Remove Construction Remove Diagram Remove Site Remove Sketching
article thumbnail

10 Design wins competition for Dongguan University of Technology in China

aasarchitecture

Situated in an ecological belt of the Songshan Lake district, the new campus sprawls over a wider site area of 137,273 sqm. Nick Cordingley, Design Partner commented: “Our design for the new campus is deeply rooted in the natural environment of the site, offering a people-oriented, sustainable and technology-driven campus.

article thumbnail

The Reel House by MCA under costruction

aasarchitecture

Image © MCA This vision and diagram extends into the design of the rest of the house: on the second floor, through a new spiral wooden staircase and a new circular bathroom, while in the basement through an oval, fully equipped projection room. Source by MCA.

Diagram 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

HarborPlace Design Review - Round 2: More Questions

Community Architect Daily

The proposed buildings could be placed anywhere in the world; what about this site in Baltimore’s Inner Harbor has shaped the buildings? In all, UDAAP members once again told MCB and lead architect Gensler that revisions were needed to their highly debated plan to redo the city's iconic Inner Harbor site. What will people do there?

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

This includes the selection of the architect and a feasibility study analysis of the site. Proposed Site Plan (555 Ocean Ave, Newport, RI) If there is an existing building, even if that building is to be demolished, a careful survey of the structure is generally undertaken. The next phase is “Construction Documentation.”

article thumbnail

Daniel Joseph Chenin, Ltd. Construct Fort 137 Featuring Unobstructed Views of the Surround Desert and Canyons

Architizer

Fort 137 – The clients sought an environmentally conscious home with a direct relationship to its site to function as a base camp for their active lifestyle. Rocks excavated from the site were used so that the building blends into the ecology while minimizing waste. Project Status: Built. Year: 2021. to learn more about this project.

article thumbnail

Cangzhou Mingzhu International Clothing Industry Characteristic Town’s Service Community | y.ad Studio

ArchiDiaries

Under such background, Cangzhou Dongsu Group took advantage of Cangzhou’s geographical advantages to invest in the construction of Mingzhu Trade City and Mingzhu International Clothing Industry Characteristic Town. Site location. Site conditions. Formal diagram. Axonometric diagram of functions. East facade.

article thumbnail

10 Design wins competition for Dongguan University of Technology in China

aasarchitecture

Situated in an ecological belt of the Songshan Lake district, the new campus sprawls over a wider site area of 137,273 sqm. Nick Cordingley, Design Partner commented: “Our design for the new campus is deeply rooted in the natural environment of the site, offering a people-oriented, sustainable and technology-driven campus.