Remove Clients Remove Engineering Remove Management Remove Permits
article thumbnail

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

BD+C

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection 0 dbarista Mon, 11/27/2023 - 15:08 Engineers Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. Customized client-specific data.

Site 52
article thumbnail

Want to Design Your Own ADU? This Prefab Company Gives You the Tools

Dwell

Type Five lets clients choose everything from floor plans to finishes via its website configurator, and then manages the rest. Prefab construction was fast, but limited the ways a client could customize a home. The clients opted for a standing seam metal roof, weatherboard cladding, and an L-shaped plan.

Clients 92
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

77 logements by ALTA architectes and Atelier 56S

aasarchitecture

Photo © Charly Broyez It follows the natural ground slope and seems to grow from the earth permitting the adaptation of each building to the existing site levels. The buildings are designed on a working grid system adhering to a rigorous structural rationality.

article thumbnail

MyCityBari by Mario Cucinella Architects

aasarchitecture

It received a construction permit from the Municipality of Bari last September. It is located at a point where the city comes into contact with nature, along a connecting line whose northern extremity is the edge of the historic centre and that extends southwards to the remains of old farming settlements.

article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Decarbonization of healthcare With the healthcare industry accounting for a yearly average of 5% of the carbon emissions of industrialized nations, many owners, architects, and engineers have already made commitments to reduce, and eventually eliminate, the carbon footprint of their healthcare building projects.

article thumbnail

The BaanTower by Powerhouse Company is set to start construction this September

aasarchitecture

The BaanTower has received an irrevocable building permit and construction will begin in September 2023, seven years after its initial conception. Situated in the heart of Rotterdam, our dramatically different black marble residential tower captures the excitement of metropolitan living.

article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

From building contractors, civil engineers, and even interior designers — we’re here to help you find out exactly who works with an architect. Whether behind the scenes or on-site to supervise construction projects, your architect needs to know how to manage both people and good design. Let’s get started.

Project 52