Remove Clients Remove Diagram Remove Engineering Remove Sketching
article thumbnail

Don’t Let the Internet Design Your Project

Life of an Architect

Despite knowing it was coming for me, I decided to post one of my recent sketches to Instagram and Facebook … and I was murdered. Internet Person : Where’s the engine? Here was the sketch that got me murdered. As I was drawing, I kept saying “This isn’t architecture … this is a diagram.

Sketching 108
article thumbnail

C.F. Møller Architects wins competition for new multi-arena in Bergen

aasarchitecture

Together with HLM Arkitektur from Bergen, engineering company DIFK from Oslo and Neill Woodger Acoustic and Theatre Design from London, C.F. Work on the zoning plan and further sketching will start at the end of 2023. Sustainability Diagram Location: Nygaardstangen, Bergen, Norway Architect: C.F. Source by C.F.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Share Your Work With the World | Upload Your Projects to Architizer

Architizer

Architects upload their work to Architizer for a variety of reasons: To showcase their projects to potential clients, share knowledge with peers, and create a shared portfolio that everyone in their team can access and share. Click here to learn how to start uploading projects to Architizer. Why upload your work to Architizer?

Project 91
article thumbnail

10 Design wins competition for Dongguan University of Technology in China

aasarchitecture

Ltd Project Architect: BIAD, Jiancai Guangzhou Construction Surveying Institution Client: Dongguan Urban Engineering Construction Administration Bureau Site Area: 101,673sqm (Phase 1) GFA: 193,500sqm (Phase 1) Height: 80m Status: Design Completion 2021 Images: Frontop , Courtesy of 10 Design.

article thumbnail

10 Design wins competition for Dongguan University of Technology in China

aasarchitecture

Ltd Project Architect: BIAD, Jiancai Guangzhou Construction Surveying Institution Client: Dongguan Urban Engineering Construction Administration Bureau Site Area: 101,673sqm (Phase 1) GFA: 193,500sqm (Phase 1) Height: 80m Status: Design Completion 2021 Images: Frontop , Courtesy of 10 Design.

article thumbnail

Daniel Joseph Chenin, Ltd. Construct Fort 137 Featuring Unobstructed Views of the Surround Desert and Canyons

Architizer

Fort 137 – The clients sought an environmentally conscious home with a direct relationship to its site to function as a base camp for their active lifestyle. The clients wanted a restrained palette that was contemporary and refined yet raw and natural. How have your clients responded to the finished project? Year: 2021.

article thumbnail

30 Best Architecture Firms in the Netherlands

Architizer

The culture of experimentation that fuses bold aesthetic detail with even bolder engineering feats comes as no surprise in a country that has, for centuries, relied on engineering to make their land liveable by draining water and relying on polders. P·A works for individual and corporate clients.