Remove Client Remove Diagram Remove IT Remove Sketching
article thumbnail

Fondation Louis Vuitton: Frank Gehry Reflects on the Making of an Architectural Icon in Paris

Architizer

Early conceptual sketch by Gehry, 2006 © Frank O. Gehry Your early sketch for the building remains an iconic example of creative conception. Our process starts with a very detailed deep-dive into the client’s space needs, their budget and the zoning constraints of the site. My sketches don’t come out of thin air.

Sketching 136
article thumbnail

Don’t Let the Internet Design Your Project

Life of an Architect

Despite knowing it was coming for me, I decided to post one of my recent sketches to Instagram and Facebook … and I was murdered. Here was the sketch that got me murdered. Since I tend to sketch when I talk, drawings and diagrams are created in real-time, right in front of the client, that reflect our conversation.

Sketching 108
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Share Your Work With the World | Upload Your Projects to Architizer

Architizer

Architects upload their work to Architizer for a variety of reasons: To showcase their projects to potential clients, share knowledge with peers, and create a shared portfolio that everyone in their team can access and share. . ➡️ Click here to explore the latest featured projects 2.

Project 95
article thumbnail

The Reel House by MCA under costruction

aasarchitecture

The inspiration and generative idea for the design derives from the client’s professional field: cinematography. Image © MCA As conceptual approach, we pursued the architectural strategy of ‘nesting’ which gave us the opportunity to design and develop the project from within, as if a ‘film within a film’. Source by MCA.

Diagram 52
article thumbnail

10 Design wins competition for Dongguan University of Technology in China

aasarchitecture

Ltd Project Architect: BIAD, Jiancai Guangzhou Construction Surveying Institution Client: Dongguan Urban Engineering Construction Administration Bureau Site Area: 101,673sqm (Phase 1) GFA: 193,500sqm (Phase 1) Height: 80m Status: Design Completion 2021 Images: Frontop , Courtesy of 10 Design. Image © 10 Design.

article thumbnail

Cangzhou Mingzhu International Clothing Industry Characteristic Town’s Service Community | y.ad Studio

ArchiDiaries

In the initial site survey, the client took us to the site and some completed projects. The client was against relying on too much purely decorations or expensive materials to create spaces and scenes like some other typical real estate projects. Formal diagram. The project has been fully launched. Site location.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

This work included interviewing the client to better understand the program of the project, which are the functional requirements of the new construction, the size and orientation of the various component parts, the aesthetic goals, the scheduling requirements, and the approximate budget that is available to design and build the project.