Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

The hard cost of construction is typically the cost for construction of the building, materials, labor, basic site work, and the general contractor’s fee. Additionally, interior specialties such as audio systems, wine rooms, solar systems, or home theaters, for example, should be identified and included in the schematic design budget.

article thumbnail

A4 Guide: The Six Phases of the Architectural Design Process

A4 Architects

555 Ocean Ave (Newport, Rhode Island) In previous Archi-TEXT articles it was discussed the value of an architect to help you navigate the various phases of the design of a new home or building or the renovation of an existing one, but what are the various phases of the architectural design process?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

The Design Process in 6 Simple Steps Why You Need A Great Commercial Architect For Your Project What is Commercial Architectural Design? Commercial architects work on projects ranging from corporate buildings and cultural venues to hospitals and airports.

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

To provide the most accurate results, a build estimate is required. Determining the total cost of a building project refers to construction estimating. Even overhead charges, and the contractor’s profit margin. So that general contractors use it when bidding on building projects. source: pinterest.com.

article thumbnail

Behind The Design 006: Get Space Vancouver by Jarod Hall of di’velept design

EntreArchitect

We do a quite a bit of self storage, and our marketing strategy is that a good looking eye catching building will get more customers that some little sign placed out front. An hourly fee to get through schematic design so that we know what we are going to be designing and then a fixed fee after that. With contractor?

Space 52
article thumbnail

LCC Health Professions Building

SW Oregon Architect

The latest is the new Health Professions Building (HPB) for Lane Community College. For all intents and purposes, we have functioned as a single office on the Health Professions Building project rather than as two separate firms. These metrics were: The degree to which the new building succeeds as a tool for teaching and learning.