8 Shenton Way by SOM among Asia’s most sustainable skyscrapers
aasarchitecture
NOVEMBER 1, 2022
The building is scheduled for completion in 2028. Nature and sustainability are driving forces behind the design. In total, the design includes more than 10,000 square meters of elevated, public green space—exceeding the entire footprint of the site. The tower incorporates leading-edge post-pandemic design features.
Let's personalize your content