Remove 2021 Remove Masterplanning Remove Permits Remove Site
article thumbnail

Under Construction: Slabtown Savier (images)

Next Portland

I hope to return to more frequent updates to this site, although I cannot make any commitments. The site was most recently used as surface parking. Other buildings in the masterplan that have been completed in the Con-way Masterplan area include the LL Hawkins and Slabtown Marketplace , The Carson , Saltwood and the Leland James.

article thumbnail

University of Brighton Moulsecoomb Campus, Sussex

e-architect

University of Brighton Moulsecoomb Campus Masterplan, East Sussex Campus Building, Southern English Development Photos. University of Brighton Moulsecoomb Campus Masterplan. Hassell completes a transformational masterplan for the University of Brighton. University of Brighton Moulsecoomb Campus Masterplan Design.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Metro Reports: Willamette Blocks, OMSI Master Plan, 5112 SE Woodstock, and more

Next Portland

Building permits have been issued for the northern two blocks of the Willamette Blocks, which include a 6-story building with 232 residential units and a 23-story building with 340 residential units. This post covers July 26th, 2021 to August 1st, 2021. We publish the highlights. Stormwater management methods TBD.

Permits 67
article thumbnail

Metro Reports: RiverPlace Redevelopment – Phase 1, Francis + Clare Place, Modera University District, and more

Next Portland

The project would include a 30-story tower with 385 residential units on the site of the former RiverPlace Athletic Club. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Stormwater will be managed on site in accordance w/ BES standards.

Permits 89
article thumbnail

Hybrid Stadium, Hangzhou, China

e-architect

The roof was computationally optimized to be constructed and installed on site in just 15 segments. The whole masterplan, the 116 acre park and its 7 buildings, were built in just three short years. The roof sits on the inner bowl and cantilevers out over the lobby to support the outer shell, a spectacular steel and glass diagrid.

article thumbnail

Metro Reports: University of Portland Shirley-Marcos Center for Design & Innovation, 31st & Hawthorne Apartments, Alberta Alive, and more

Next Portland

A building permit is under review for the University of Portland Shirley-Marcos Center for Design & Innovation, designed by Opsis Architecture. Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Includes associated site work. 21-105880-MT.

article thumbnail

Viglostasi Residence, Syros, Greece property

e-architect

Yet, this is a single, private holiday home, nestled in its secluded, natural site of the Cycladic Island of Syros. The result is a 500 sq m complex of low, orthogonal volumes, arranged around a network of pathways that connect both enclosed spaces and the various terraces, gardens, and patios on site.