Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Of course, each project is unique and complex sites or functional requirements can add additional costs to these elements. The hard cost of construction is typically the cost for construction of the building, materials, labor, basic site work, and the general contractor’s fee.

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Also includes quality control, protection, utilities, administration, legal fees, and permits. Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design. Level 3 – Initial or Design Development: Even during the design phase of a project, estimates are revised.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Campus map showing the various sites considered during the site selection process. The site selection process proved eye-opening. We studied several candidate sites, but the Steering Committee ultimately chose one that wasn’t initially on anyone’s radar screen. While more challenging to work with than the others, Site N.3

Building 209