article thumbnail

Under Construction: Slabtown Savier (images)

Next Portland

Other buildings in the masterplan that have been completed in the Con-way Masterplan area include the LL Hawkins and Slabtown Marketplace , The Carson , Saltwood and the Leland James. A building permit for Slabtown Savier North was issued on November 23rd, 2022.

article thumbnail

Metro Reports: RiverPlace Redevelopment – Phase 1, Francis + Clare Place, Modera University District, and more

Next Portland

Next Portland covers the highlights of the Early Assistance applications, Land Use Reviews and Building Permits processed each week. Parking will be provided by utilizing unused existing spaces in the adjacent Douglas Apartments garage, which contains 385 stalls. Metro Reports have moved to Portland Maps Reports.

Permits 89
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

article thumbnail

26 Pioneering Architecture Firms Rethinking the Fundamentals of Design

Architizer

Adept across diverse scales and geographies, from private gardens to city parks and municipal masterplans, the practice delivers enduring, legacy spaces that forge meaningful connections with the organic world and the wider community. The studio’s portfolio showcases its attention to detail and aptitude for problem-solving.

Firms 96
article thumbnail

St Christina’s Primary School, St John’s Wood, London

e-architect

Through extensive consultation with the school and its governors, a masterplan was developed which captured the aspirations for school which was then divided into a two-phase development project. The masterplan included the restacking of the school, with early years located at the lower level, rising to Year 6/Key Stage 2 on the upper floors.

article thumbnail

The Rise and Fall of Baltimore's HarborPlace

Community Architect

No tall building would be permitted on the waterfront except for the eventually constructed Ian Pei designed World Trade Center The waterfront would be protected as parks, public areas with a wide promenade. No updated masterplanning, no publicly established framework and no competitive selection of a developer. There was a Harbor 2.0

Contract 111
article thumbnail

6 Pioneering Urban Planning Projects Transforming Public Space

Architizer

From ambitious, sprawling masterplans to ingenious infrastructure schemes and exciting adaptive reuse initiatives, discover how innovative urban planning is helping to reclaim corners of the city for the wider community. Flat expanses of sand-hued concrete frame the fort, evoking the historic desert terrain that predated the busy metropolis.

Space 85