Remove Management Remove Safety Remove Structural Engineering Remove Structure
article thumbnail

Webuild and Carlo Ratti propose replacement for Baltimore’s collapsed Key Bridge following tragedy

Archinect

Today, the Webuild group advanced a proposal designed in collaboration with architect and MIT professor Carlo Ratti and French structural engineer Michel Virlogeux for a new bridge in Baltimore that would replace the collapsed Francis Scott Key Bridge.

article thumbnail

How to properly assess structural wind damage

BD+C

How to properly assess structural wind damage 0 dbarista Mon, 06/05/2023 - 16:17 Engineers Properly assessing wind damage can identify vulnerabilities in a building's design or construction, which could lead to future damage or loss, writes Matt Wagner, SE, Principal and Managing Director with Walter P Moore.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

REX creates "holy grail" combination of performance spaces in Providence

Deezen

Called The Lindemann Performing Arts Center (The Lindemann) the 101,000 square-foot (9,383-square-metre) structure consists of a shoebox theatre with a long bridge-like walkway. It has a number of automated safety features including a laser system that halts operations if something is detected between two moving parts.

Space 126
article thumbnail

Archaeological Museum by Nieto Sobejano Arquitectos

aasarchitecture

The square shape of the gallery, covered with an exposed concrete structure, resonates with the orthogonal geometry of the original project, offering a large exhibition space that can be subdivided. Working within the material and conceptual constraints of a building requires discipline and restraint.

article thumbnail

Eugene/Architecture/Alphabet: O

SW Oregon Architect

Christian Church Homes of Oregon is the building’s current owner, and Viridian Management is its operator. Lift slab construction has faced safety concerns, some of which stemmed from design flaws, inadequate construction practices, or unforeseen complications during the lifting process.

article thumbnail

JKMM Architects adds timber art hall to Tammisaari old town

Deezen

Helsinki-based JKMM Architects used glulam and black spruce cladding to relate the Chappe Art House to surrounding timber structures in the coastal town of Tammisaari, Finland. It has a glued laminated (glulam) timber structure and was clad in black-stained spruce as a nod to the nearby timber buildings.

Art 121
article thumbnail

Ross Barney Architects encloses NASA testing facility in unique copper-concrete panels

Deezen

It has a structure made of concrete mixed with copper This included the creation of a special concrete mixed with copper for a series of precast walls erected for a radar antenna-testing lab, which stands as a siloed element taller than the rest of the glass-clad building with a separate foundation.