article thumbnail

Steven Holl and SKUPINA-designed Terezín Ghetto Museum advances

Archinect

The firm was named the winner of an international competition to design an extension of the existing museum in 2022 and will deliver the project on the site, which was first constructed as a citadel in 1780. The Schematic Design phase was completed in March.

article thumbnail

Schematic Design – This isn’t “Architecture”

Life of an Architect

This phase of the work is widely referred to as “Schematic Design” Although some people also have an earlier phase called “Programming”, I tend to consider that as part of the schematic design phase as well, rather than separate it out into its own special section. It was way better.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What is Commercial Renovation?

The Architecture Designs

Commercial renovation involves restoring or repairing certain features of an existing construction project. These renovations can be for the whole building, a single floor, or just office space. Examples of construction renovation projects include installing new light features, replacing exterior brick, and replacing tiles.

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

Most notable among these are the Lyllyle Reynolds-Parker Black Cultural Center, the first phase of the Knight Campus for Accelerated Scientific Development , Unthank Hall, the Millrace Drive Garage, Bean Hall renovation, the University Health & Counseling Center expansion, and the new Hayward Field.

Project 218
article thumbnail

Neighborhood Bank

Bruce F. Roth Architect

The project required extensive demolition and site work; gutting and renovation of a series of storefronts; new mechanical and electrical systems; and a new drive-up facility. Project Architect / Project Manager: Involved with the project from schematic design through construction. Lyon & Associates (now RGLA Solutions).

article thumbnail

Banking Center

Bruce F. Roth Architect

The steel and glass, 1960’s era ‘jewel box’ had seen many interior changes over the years and was in dire need of renovation. Project Architect / Project Manager: Involved with the project from schematic design through construction. The gut-rehab totally reorganized the office spaces and banking floor.

article thumbnail

A Day in the Life of an Architect

Life of an Architect

We have started working on a 4 phase renovation and addition project with a local church and these were meeting minutes and notes from our first design development construction cost estimating meeting. This was the project that I used when talking about sketching during schematic design.