Remove Estimating Remove Permits Remove Structural Engineering Remove Transportation
article thumbnail

Land Morphology and Olson Kundig update Oregon botanical garden

Deezen

Project credits: Prime consultant and landscape architecture: Land Morphology Land Morphology team: Richard Hartlage (principal in charge), Lindsey Heller (project manager), Sandy Fischer (lead planner), Garrett Devier (project landscape architect), Brandon Burlingame (landscape designer) Architecture: Olson Kundig Structural engineering: Lund Opsahl (..)

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Work is organized into three principle activities: 1) Design Development and Entitlement Processes ; 2) Site Development Permits and Construction Documents for Upper Garden Development ; and 3) eighteen months of construction. The first phase is approximately seven acres.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Explorers at Home

Landscape Architecture Magazine

Prosper Portland, an economic development agency, gave $2 million, and Portland Metro, the transportation agency, made a $188,000 grant. Phase One Project Team (Upper Garden Development, Permitting, and Construction Documents). Electrical Engineer Reyes Engineering, Portland, Oregon. The city gave the garden $6.5

Home 86
article thumbnail

Going Solar: The Rays That Pay

Community Architect

Going solar for buildings is not only as effective as improving transportation (another 40%), the two can be linked with solar as the power source for electric vehicles. Calculators help estimating the solar exposure, such as the National Renewable Energy Laboratory (NREL) PVWatts Calculator or Google's Project Sunroof.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

A technical grid on the Warehouse ceiling permits any type of use, from concert to exhibition. A 33-metre-long bar is split in two by the ‘mega pig’ which is a key part of the building’s structural engineering, holding up the proscenium arch above. When SIM is open people can seamlessly move between the spaces.

Art 79