article thumbnail

Re-framed Initiative – Study of Retrofit Schematic Designs

Westeck News

This is achieved through the selection of low-carbon construction materials, installation of highly efficient technologies (like heat pumps) and integration with a supply of clean energy. Enjoy our latest line of energy efficient windows and doors designed to enhance modern and contemporary architecture.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

The south entrance leads to a new campus plaza and a soon-to-be-installed pedestrian bridge connecting to Bristow Square in the heart of the campus. The second phase of design developed this concept in detail. Rendering of the north-facing elevation. Note the proposed mural within the portico.

Building 206
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Competitions: International Design Competition for Namdo Righteous Army History Museum

Bustler

Establish a comprehensive master plan for museums and historical parks for the entire site, and create a complex cultural space such as creating a walking trail, installing sculptures, creating a theme forest and etc to become a base for local cultural tourism. ? KRW 27,000,000,000 (VAT Incl.) ?

article thumbnail

What is Commercial Renovation?

The Architecture Designs

Examples of construction renovation projects include installing new light features, replacing exterior brick, and replacing tiles. Beyond these, estimated costs are taken into account. They must be fully licensed, have relevant experience, and provide realistic cost estimates. How Long Does Commercial Renovation Take?

article thumbnail

Competitions: Pre-announcement | Open Tender for Exhibition Design of Shenzhen Natural History Museum

Bustler

4 Tender Scope Tender Area: The total floor area of the tender for exhibition design of this project is about 43000 square meters, among which the exhibition area is about 35000 square meters and the education area is about 8000 square meters. The tender requirements are subject to the final official tender documents.

Nature 40
article thumbnail

Back to the Garden

Landscape Architecture Magazine

The Museum at Bethel Woods, devoted to documenting and memorializing the event, had summoned the archaeologists to an area where large-scale artworks had been installed for the festival and camping took place. The organizers hired help to ready the property for the arrival of what they estimated would be about 100,000 people.

article thumbnail

100 Women to Watch in Architecture

Architizer

Right: Public Farm 1, a 2008 installation on the grounds of Long Island City’s MoMA PS1 by Amale Andraos’s firm, WORKac; the museum described the installation as “a living structure made from inexpensive and sustainable materials recyclable after its use at PS1”; images via MoMA PS1 and Archinect. Valerie Schweitzer.