Remove Engineering Remove Safety Remove Schematic Design Remove Zoning
article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

LCC is using the bond to address safety, security, and accessibility for all students on its campuses, workforce retraining and career technical education investments, and classroom and learning space updates to meet the needs of current and future students. The company has attracted $30 million in Opportunity Zone equity for the development.

Project 217
article thumbnail

The Commercial Design Process: How it Works in Cape Town

DesignScape Architects

Commercial architects need to cater to the public and understand how large groups use communal spaces while maximising functionality, comfort, and safety for everyone who enters the building. Many corporate institutions will have branding requirements that must be included in designs.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Changsha International Conference Center by SCAD

aasarchitecture

The glass is ultra-clear insulating glass, incorporating an ionic membrane for explosion-proofing, energy-saving, and safety purposes. Shenzhen Sanxin Facade Engineering Co., Beijing Jangho Curtain Wall System Engineering Co., Landscape design: Architectural Design & Research Institute of SCUT Co.,

article thumbnail

Singapore’s new Science Centre by Zaha Hadid Architects

aasarchitecture

Singapore’s Science Centre Board has unveiled the design of the new Science Centre which will provide unique facilities and programmes as a destination for all Singaporeans to access science, technology, engineering and mathematics (STEM) education and experiences. Image © Zaha Hadid Architects (ZHA).

article thumbnail

LCC Health Professions Building

SW Oregon Architect

Lane County voters passed a general obligation bond in May 2020 to fund the project, as well as assortment of campus-wide improvements addressing classroom needs, safety and accessibility deficiencies, workforce retraining, and Career Technical Education. Overall, the project is on track to achieve LEED Gold certification.

Building 205
article thumbnail

New Science Centre at Jurong Lake Gardens

e-architect

Singapore’s Science Centre Board has unveiled the design of the new Science Centre which will provide unique facilities and programmes as a destination for all Singaporeans to access science, technology, engineering and mathematics (STEM) education and experiences. Structural Engineering: WEB Structures. image © Negativ.

article thumbnail

What’s the Best Testing Order for ARE 5.0?!?

Young Architect

This exam is all about programming, site analysis, and zoning/codes. Think: Investigation (not design). Project Planning and Design Exam (PPD). Now you’ll start moving into design and schematic designs of sites and buildings. Building Systems (BS) : MEP and engineering. The exams from ARE 4.0