article thumbnail

Behind The Design 006: Get Space Vancouver by Jarod Hall of di’velept design

EntreArchitect

EntreArchitect: Behind the Design is a weekly blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. AAI Engineering (Civil). HW Engineering (Structural). What was the process for permitting? Click here to learn how.

Space 52
article thumbnail

Behind The Design 005: River House by H. Sloane Mayor of UK Architects

EntreArchitect

Engineering Ventures, Resilient Buildings Group. Firm Address. What was the process for permitting? The permitting was straight forward but not simple – we needed both a building permit and a wetlands administrative permit through the town of Hanover and a state of NH shoreline protection permit.

Permits 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

EntreArchitect Behind The Design 009: SteelHouse 1&2 by Zack/de Vito Architecture & Construction

EntreArchitect

EntreArchitect: Behind the Design is a weekly blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. Structural- Double D Engineering. Firm Address. What was the process for permitting? Click here to learn how. Project Name.

article thumbnail

26 Pioneering Architecture Firms Rethinking the Fundamentals of Design

Architizer

The New York-based firm offers its clients a full-service architectural package, incorporating design, permitting and construction management. From commercial to residential projects, the firm is deeply involved in every step of project planning, from design conception to material selection and sourcing suppliers.

Firms 92
article thumbnail

Behind the Design 001: Calender Rd. by Allen Architecture, LLC

EntreArchitect

JHF Construction (GC), H&H Engineering (Structural), edited (furniture, art, staging). Firm Address. What was the process for permitting? The permit review for Arlington is set up for production builders (masonry requirements, garage requirements, checklist of required “architectural facade elements”, etc.)

Permits 52
article thumbnail

Behind The Design 003: Canal House by The Ranch Mine

EntreArchitect

MPE Engineer, Structural Engineer, and Civil Engineer. Firm Address. What was the process for permitting? We submitted the plans and permitting took about 2 months, a pretty standard timeline for the City of Phoenix. Project Location. Phoenix, AZ. The Ranch Mine. Architect’s Name. Cavin Costello.

Mining 52
article thumbnail

EntreArchitect Behind The Design 008: Soaring Wings by Winn Wittman

EntreArchitect

EntreArchitect: Behind the Design is a weekly blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. BD&E Engineering, Home As Art, Mangrum Construction. Firm Address. What was the process for permitting? Project Name.