Remove Developer Remove Estimating Remove Permits Remove Utilities
article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

The process of estimating projects might be very complicated. That is why careful construction estimates are necessary to ensure nothing gets overlooked. To overcome these complications, you need to have the best Construction Estimating Services. To provide the most accurate results, a build estimate is required.

article thumbnail

Investing in the Future: How to Plan and Present a Winning Resort Design Proposal

Arcmax Architects

We will explore the key elements that need to be considered, such as market analysis, concept development, sustainability, and financial feasibility. It serves as a blueprint for the entire development process, guiding your team and ensuring that everyone is aligned with the vision. Let's explore each of these components in detail.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Leach Botanical Garden, Portland, Oregon

e-architect

Wilbert Davies, who later became a notable California-based landscape architect, was retained by the Leach family to develop landscaping plans. Phase 1 focused on developing the upper garden and establishing connections between it and the lower, house and historic garden, garden. The first phase is approximately seven acres.

article thumbnail

Reasons an Addition Will Improve Your Home

DesignRulz

Whether you’re thinking of developing a room or adding an in-law apartment. You can develop enough space for your guests to stay in a spare guest room. Increased Storage You might need a utility room for your activities like putting on sports gear, musical equipment, clothing, children’s toys, and many more.

Home 52
article thumbnail

LCC Health Professions Building

SW Oregon Architect

3’s limitations (which included its limited area, narrow proportions, and web of existing buried utilities) were not so onerous as to outweigh its considerable promise. The second phase of design developed this concept in detail. Mahlum’s resultant design concept is largely shaped by the selection of Site N.3.

Building 209
article thumbnail

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

BD+C

At Walter P Moore, our solution is to solve design virtually, by producing a building information model (BIM) at Level of Development 400 (LOD400). It is estimated, but it will not be known exactly until the project is complete. This article will discuss a method to improve the shape of the influence curve.

article thumbnail

022: Residential Construction Costs

Life of an Architect

Some examples of hard costs are: Providing utilities to the site if not currently present Site Preparation (clearing away trees, stabilizing soil, cutting and filling to grade the site, etc.) Let’s start by identifying that hard costs are the physical assets that you need to acquire to complete your construction project.