article thumbnail

Schematic Design - Developing a Project Budget

Matt Fajkus Architecture

Keep in mind that early pre-design cost per square foot ranges may be for the building only, while your project may include specialty elements that will need to be added on for things like extensive landscaping, decks, patios, pools, specialty site work like large retaining walls or bringing utilities to rural sites.

article thumbnail

LCC Health Professions Building

SW Oregon Architect

3’s limitations (which included its limited area, narrow proportions, and web of existing buried utilities) were not so onerous as to outweigh its considerable promise. Mahlum’s resultant design concept is largely shaped by the selection of Site N.3. Overall, the project is on track to achieve LEED Gold certification.

Building 206
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

An Architect’s Guide To: Designing Your First Passive House

Architizer

Shifting mechanicals away from windows also provides great design opportunities. First, we bring in Passive House consultants early in schematic design. This ensures that while we design, we keep important performance measures in mind. We also include general contractors as early as possible.

Housing 74
article thumbnail

The practical magic of the design process

BD+C

That’s Craig’s summary, and it aligns with what he calls one of the most exciting parts of the design process, which is “translating something intangible into something tangible.” Standard design projects rely on a three-phase approach: Schematic design Design development Construction documents Schematic design is about the “big idea.”

article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

have in store for interested design professionals, contractors, subcontractors, and suppliers. LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project. Atkins Dame, Inc.

Project 218
article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

On its own, preservation and reuse of a historic building is an inherently sustainable strategy due to the utilization of existing material resources and their embodied carbon footprint, combined with the reduction of energy and waste associated with demolition and construction.

article thumbnail

Information about Construction Estimating: Concepts, Tips, and Free Templates:

The Architecture Designs

Even overhead charges, and the contractor’s profit margin. So that general contractors use it when bidding on building projects. Also includes quality control, protection, utilities, administration, legal fees, and permits. Level 2 – Advanced or Schematic: The estimate incorporates the developed schematic design.