Behind The Design 004: Titan Two by F9 Productions
EntreArchitect
JULY 12, 2018
Front Range Structural Engineering. Firm Address. What type of fee structure did you use on this project? Self financed. This was design-build, all done by our firm. With contractor? Because we designed and built the two structures, either Lance or I were on site most of the time. Project Name.
Let's personalize your content