Remove Contractor Remove Engineering Remove Schematic Design Remove Windows
article thumbnail

2022 Projects in the Pipeline

SW Oregon Architect

have in store for interested design professionals, contractors, subcontractors, and suppliers. LCC Health Professions Building - Schematic Design Phase rendering It’s my pleasure to currently work with Tom on the new Health Professions Building project. Systems West Engineers FM Sheet Metal, Inc.

Project 220
article thumbnail

Romney Hall Renovation at Montana State University by Cushing Terrell

aasarchitecture

Photo © Karl Neumann Built in the Italian Renaissance Revival style, the building has a beautifully detailed tapestry brick façade featuring unique terra cotta spandrels decorated with sporting equipment, large wood and steel windows, copper detailing, and a barrel-vaulted metal roof.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Refining Design – The Design Development Phase

Matt Fajkus Architecture

After the schematic design phase has been completed and a viable project budget has been developed, it is time to design the building’s structural system, layer in mechanical, electrical and plumbing systems, and refine the design of functional spaces.

article thumbnail

Woven Designs L Shape Vacation Home Vertes Retreat

Architizer

Thankfully, Jenkins Construction (the General Contractor), owner and designers resolved to continue with all aspects of the project as efficiently as possible. How did the context of your project — environmental, social or cultural — influence your design? © Woven Architecture and Design. Phillip Van Horn Design.

Home 67
article thumbnail

Documenting Architecture with Photos

Life of an Architect

Most of the time I coordinate these site visits with some milestone or because the contractor has a question that requires my presence on site to answer … but I go by the job site even more than required because I truly enjoy being on site and watching how things come together. This is the handiwork of our structural engineer.

article thumbnail

Letters of an Architect: Lessons from my Best Projects

Community Architect

As a step towards the schematic design refinements, my boss had prepared 6' long pencil-drawn and marker-colored large-scale wall sections on narrow sketch paper strips that showed how everything should fit together. There were no " ed-specs " as is common in today's school design.

Project 80