Remove Contract Remove Government Remove Permits Remove Site
article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Project Scale: The CGN New Research Center, which consists of 2 plots, covers a total site area of 71752.4?. The Plot I, land for scientific research, covers a site area of 33861.6?, and the Plot II, land for new industry, covers a site area of 37890.8?. Provide design consultation to the owner and government authorities.

article thumbnail

Meet the Team: Who Works with an Architect on a Design Project?

DesignScape Architects

Whether behind the scenes or on-site to supervise construction projects, your architect needs to know how to manage both people and good design. From preparing detailed drawings with relevant authorities to adapting your design to meet mechanical or electrical requirements, your architect deals with several people daily.

Project 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Insights: What do different engineers do, and when do I hire one?

Matt Fajkus Architecture

Before starting any new project, it’s important to check with your local governing body to see which types of submittals are necessary to obtain permits and which types of people need to certify those submittals. While it’s best to hire an engineer when doing any type of construction, they are not always necessary.

article thumbnail

Competitions: Tender for Schematic Design and Foundation Pit Design of CGN New Research Center Pre-qualification Announcement

Bustler

Project Scale: The CGN New Research Center, which consists of 2 plots, covers a total site area of 71752.4?. The Plot I, land for scientific research, covers a site area of 33861.6?, and the Plot II, land for new industry, covers a site area of 37890.8?. Provide design consultation to the owner and government authorities.

article thumbnail

WALA Refurbishes Federation-Style Bungalow Into Coburg Freeboard House

Architizer

The new extension is elevated in response to the flood-prone site, creating a series of terraced floorplates that present opportunities for the formation of interesting spaces within the house. Our office was engaged for the design and permit approvals. It was very much a labour of love on their part.

Housing 67
article thumbnail

LCC Health Professions Building

SW Oregon Architect

Campus map showing the various sites considered during the site selection process. The site selection process proved eye-opening. We studied several candidate sites, but the Steering Committee ultimately chose one that wasn’t initially on anyone’s radar screen. While more challenging to work with than the others, Site N.3

Building 205
article thumbnail

The Rise and Fall of Baltimore's HarborPlace

Community Architect

Only Domino Sugar's processing factory and dock remained active within site of the Inner Harbor. No tall building would be permitted on the waterfront except for the eventually constructed Ian Pei designed World Trade Center The waterfront would be protected as parks, public areas with a wide promenade.

Contract 111